Archive for August, 2019:

Our 9 Step Approach to Utility Relocation

Posted on Wednesday, August 21st, 2019 by Mike McKenna
In Surveying, tagged in Tags: , , 9 steps to relocate utilities

Utility relocation plays a large role in many of our projects. As a result, we’ve developed a tested process for coordinating with utilities. Here are the nine steps we take each time: We start by communicating early and often. During the survey process, our team will make the “one-call,” survey the flagged areas, prepare a […]

National PE Day

Posted on Wednesday, August 7th, 2019 by Peggy Amor
In Culture, tagged in affinis national pe day

In 1907, the first professional engineering license was issued to Charles Bellamy in Wyoming. Since that time, the profession has evolved considerably with engineers designing and maintaining many of the facilities we rely on each day – water, roads, and electricity. To raise awareness about what it means to be a professional engineer (PE), recognize […]