
Route 7, from Pink Hill Rd. to Victor Dr., in Blue Springs, Missouri was deteriorating. To maintain their standard, the Missouri Department of Transportation’s Lee’s Summit Office (MoDOT) wanted to resurface this 3.32 miles of roadway. They selected our construction engineering team to oversee the project.