Archive for July, 2024:

City of Overland Park Achieves Vision for Metcalf Avenue

Posted on Wednesday, July 31st, 2024 by Affinis Corp
In Roadway, tagged in https://affinis.us/city-of-overland-park-achieves-vision-for-metcalf-avenue/

The City of Overland Park, Kansas wanted to upgrade Metcalf Avenue to a traditional arterial with curb, gutter, and medians, as part of their “Vision Metcalf” plan. Between 91st to 99th Street, the corridor had open drainage ditches and an aging roadway, not in keeping with their goals for the area’s appearance. They selected our […]

City of Shawnee Protects Residential Intersection with Drainage Improvements

Posted on Tuesday, July 23rd, 2024 by Affinis Corp
In Construction Engineering, Stormwater, tagged in

An aging corrugated metal pipe (CMP) located under 71st and Midland, a major residential intersection, needed to be replaced. The City of Shawnee, Kansas knew the current solution was failing. They were looking for a partner who could help them find the best path forward. Our stormwater group began the project by conducting a hydraulic […]