Archive for July, 2021:
4 Tested Strategies for Maintaining Lakes and Dams
Posted on Tuesday, July 20th, 2021 by Affinis CorpIn Structural, tagged in
![](https://affinis.us/wp-content/uploads/2021/07/lake-truck.jpg)
Performing routine assessments is critical to maintaining the integrity of dams and lakes. Catching issues early increases safety for those in the area and often translates to a lower project cost. For more than three decades, we’ve conducted these checks and have developed a list of four key takeaways. You’ll find each one below. Conduct […]
3 Practical Engineering Solutions that Solved Complex Problems
Posted on Wednesday, July 14th, 2021 by Affinis CorpIn Project Strategies, tagged in
![liberty sheet pile](https://affinis.us/wp-content/uploads/2021/07/liberty-sheet-pile_700.jpg)
Liberty Drive Improvements shown above. Finding the right solutions to solve simple or complicated design issues often requires out-of-the-box thinking. Today, we’re excited to share three practical solutions that solved complex problems. Upper Cedar Creek The City of Olathe, Kansas needed to upgrade their stormwater infrastructure in a busy industrial area to address ongoing flooding […]