Posts Tagged ‘fort riley’

Fort Riley Main Post Stormwater Study Ranks System Upgrades for Next 30 Years

Posted on Wednesday, January 15th, 2020 by Affinis Corp
In Federal Services, Stormwater, tagged in Tags: , , , fort riley stormwater study

Fort Riley’s Main Post was constructed in the early 1900’s. Given the age of the facilities, there were few maps, as-builts, or internal historical knowledge about the stormwater system. Fort Riley’s Directorate of Public Works (DPW) was addressing system problems, but wanted a comprehensive improvement plan that considered all of the Main Post’s needs and […]

Improvements to Camp Funston Will Reduce Maintenance

Posted on Wednesday, December 18th, 2019 by Affinis Corp
In Federal Services, tagged in Tags: , camp funston project

The Fort Riley Directorate of Public Works (DPW) wanted to provide an efficient drainage system for Camp Funston. DPW worked with the United States Army Corps of Engineers (USACE) and Affinis to design a solution that drains the very flat grades and improves undersized pipes to meet the current 10-year design standard. Improvements will reduce […]